Iron BC
  • ABOUT US
    • ABOUT THE COMPANY
    • MISSION
    • STRATEGIES
    • SERVICES
  • PROJECTS
    • MOVABLE BRIDGES
    • BRIDGES
    • WATER TREATMENT
    • ELEVATED STRUCTURES
    • STADIUM PARKS
  • CAREER
  • LINKS
  • CONTACT

BRIDGES



  • MARINE PARKWAY BRIDGE
  • GOETHALS BRIDGE
  • GEORGE WASHINGTON BRIDGE
  • RTE 46 BRIDGE
  • THIRD AVENUE SWING BRIDGE
  • SIX BRIDGES
  • HENRY HUDSON BRIDGE
  • COMMODORE BARRY BRIDGE



Henry Hudson Bridge
Bronx, New York (2012-Present) - $5,615,400.00
Scope: Repairing and Replacement of Deteriorated structural steel members, repairing and sealing concrete surfaces of the approach piers and skewbacks. Involvement: Prime Contractor (General Contractor)
Copyright 2013 Iron Bridge Constructors All Rights Reserved

Designed by Ertug Goktas